Major Grade Separation Projects Advance with Engineering Contracts
The committee approved two significant engineering agreements for major railroad overpass projects totaling over $4 million.
TranSystems Corporation received a $4,003,256 contract for construction engineering services on the Lorenzo Road overpass project spanning the BNSF Railroad in county board District 1. This project, funded entirely by BNSF Railway, will construct a new two-span bridge carrying Lorenzo Road over the railway, including realignment of Cottage Road and temporary construction access.
The Lorenzo Road project represents one of two major grade separations planned to reduce train-related traffic delays in the county.
A separate agreement with Burns & McDonnell for supplemental design services on the Wilmington-Peotone Road corridor was approved for $1,902,165. This covers the section from I-55 to Drecksler Road spanning county board Districts 1 and 2.
The Wilmington-Peotone Road project emerged from a comprehensive study to improve east-west connectivity in the county and reduce conflicts between vehicular and rail traffic.
Construction timelines for both projects will depend on completion of design work and right-of-way acquisition.
Latest News Stories
Biometrics privacy law’s territorial reach limited, appeals court says
Watchdog says Biden Education Department defied court order on Title IX enforcement
Congress skips town without passing $72B immigration enforcement bill
EPA slashes regulations on refrigerants finalized during Biden-era
Illinois Quick Hits: State unemployment rate still more than 5%
Mace amendment would spare Democrats she targeted
Illinois to require hidden ‘junk fees’ included in advertised price
WATCH: Trump says Iran ‘won’t have nuclear weapon’
Prescription board bill advances without money
Feds charge 15 in $90M Minnesota childcare, Medicaid fraud
House GOP pushes Pritzker for local control
Illinois Quick Hits: Freedom Caucus urges DOJ investigation of Illinois