Article Summary:

The Will County Landfill Committee received a comprehensive technical update on the site investigation for the planned horizontal expansion of the county landfill, confirming the project remains on schedule. Consultants presented detailed findings from the completed geological and hydrogeological fieldwork, which will inform the final engineering and design of the new landfill area to ensure public and environmental safety.

Landfill Expansion Key Points:

  • Drilling of nine new borings and continuous soil and bedrock sampling for the expansion area is complete, with samples being sent for extensive laboratory analysis.

  • Fourteen new piezometers, or monitoring wells, have been installed to characterize groundwater conditions and will be used for an impact evaluation model.

  • Engineers are refining the expansion’s design, including adjusting the northern boundary to maximize airspace and designing a V-notched base for efficient leachate collection.

  • Despite the fieldwork phase taking slightly longer than anticipated, project consultants confirmed the overall expansion timeline has not been delayed.

The Will County Landfill Committee on Thursday received a detailed update on the extensive site investigation for the planned expansion of the county landfill, learning that the project remains on schedule as engineers begin analyzing a trove of geological data.

A consultant for the project, Mr. Fallon, walked committee members through the now-completed fieldwork phase, which involved drilling nine borings as deep as 140 feet to characterize the soil, clay, and bedrock at the proposed expansion site. He explained that the purpose of the in-depth investigation is to provide engineers with the necessary data to design a site that protects public health, safety, and welfare.

“We have logged and continuously sampled nine additional borings to supplement that information at the existing facility,” Fallon stated. “Those samples have all been delivered to the lab. And actually… we have already received back I would say about 75% of those analytical results.”

The investigation included collecting undisturbed soil samples using Shelby tubes and rock cores to conduct a battery of laboratory tests. These tests, Fallon explained, measure properties like soil density, moisture content, permeability, and shear strength. The results are critical for engineering calculations that ensure the stability of the landfill’s slopes and foundation.

In addition to soil stability, the investigation is focused on groundwater. Fourteen new piezometers—small-diameter wells—have been installed at various depths to monitor different water-bearing zones. This data will be used to create a groundwater impact evaluation model.

“We’ll take the landfill design once it’s once our engineers have developed that and then we’ll… place it into the into the geologic system,” Fallon said in response to a question from member Dawn Bullock. “And then we’ll assume that it’s leaking and we’ll evaluate… after 100 years after closure what are the what are the concentrations of this hypothetical plume at the zone of attenuation.”

Fallon noted that this modeling is a state requirement for the sighting application.

The data is already informing design tweaks. Stormwater modeling has shown that the planned retention ponds are larger than necessary, allowing engineers to push the landfill’s northern boundary slightly to “eek out a little more airspace.” They are also designing the base grades with a “V-notch design” to better channel leachate to a sump location for extraction.

County Board Speaker Joe VanDuyne asked if the water from the underlying aquifer could be utilized by the county. Fallon explained that this would be out of the question, citing both the unsuitability of the small monitoring wells for water supply and a deed restriction on the property. “We have a deed restriction we’re not allowed to use any of the water for drinking purposes,” he said.

Vice-Chair Kelly Hickey, who chaired the meeting, asked if there were any changes to the project’s timeline.

“We haven’t had a delay in the project yet,” Fallon responded. “The field investigation did take a little longer than we than we had thought it would… but within the larger framework of the project, I feel like we’re still on schedule.”

Leave a Comment





Latest News Stories

Trump: Iran operations to continue until objectives achieved

Trump: Iran operations to continue until objectives achieved

By Sarah Roderick-FitchThe Center Square Combat operations will continue in Iran at “full force” until American “objectives are achieved,” President Donald Trump said during his second address to the nation...

Everyday Economics: The Fed’s labor-market reality check

By Orphe DivounguyThe Center Square Last week wasn’t about a single data point. It was about a shift in tone from policymakers: the labor market may be weaker than the...
Trump: Nine Iranian ships destroyed; Iran wants to talk

Trump: Nine Iranian ships destroyed; Iran wants to talk

By Sarah Roderick-FitchThe Center Square Nine Iranian ships have been “destroyed and sunk” by U.S. forces as part of Operation Epic Fury, according to President Donald Trump. The president’s announcement...
Supreme Court to hear gun possession for drug users case

Supreme Court to hear gun possession for drug users case

By Andrew RiceThe Center Square The U.S. Supreme Court will hear arguments on Monday in a consequential case over whether regular drug users can possess firearms. The case, U.S. v....
CENTCOM quashes Iranian claims of missile strikes on Lincoln

CENTCOM quashes Iranian claims of missile strikes on Lincoln

By Sarah Roderick-FitchThe Center Square U.S. Central Command is calling claims by the Islamic Revolutionary Guard that it struck the USS Abraham Lincoln a “lie.” The IRGC said that it...
CENTCOM: Three U.S. service members killed; first casualties of Operation Epic Fury

CENTCOM: Three U.S. service members killed; first casualties of Operation Epic Fury

By Sarah Roderick-FitchThe Center Square Three U.S. service members have been killed in action by Iranian strikes as part of Operation Epic Fury, according to U.S. Central Command. In addition...
Ahead of Iran strikes, CBP, DOJ taking action against Iranian influence in US

Ahead of Iran strikes, CBP, DOJ taking action against Iranian influence in US

By Bethany BlankleyThe Center Square Ahead of the U.S. strikes against Iranian leaders on Saturday, federal agents had already been addressing Iranian threats in the U.S. and on the high...
Will County Board Graphic.04

Will County Board Advised on Strict “Judicial” Role Ahead of Landfill Expansion Application

Will County Landfill Committee Meeting | February 10, 2026 Article Summary: During a detailed legal briefing on Tuesday, the Will County Landfill Committee received strict instructions regarding their conduct during...
Committee-Ad-Hoc.Graphic

Ad-Hoc Committee: Bath House Regulations Updated; Removes 60-Day Licensing Window

Will County Ad-Hoc Ordinance Review Committee Meeting | February 10, 2026 Article Summary: The Will County Board Ad-Hoc Ordinance Review Committee approved updates to the regulations governing bath houses and...
Committee-Land Use.Graphic

Land Use Committee Rejects Shorewood Solar Farm Despite 25-Year Lease Offer

Will County Land Use & Development Committee Meeting | February 5, 2026 Article Summary: The Will County Land Use and Development Committee voted against recommending a controversial solar farm proposal...
Screenshot 2026-02-22 at 5.06.42 PM

Trustees Renew Federal Lobbyist Contract Following $800,000 Funding Win

Joliet Junior College Board of Trustees Meeting | February 18, 2026 Article Summary: The JJC Board voted to renew its contract for federal lobbyist services on Wednesday. Administration and supporting...
Committee-Executive.Graphic

Executive Committee Advances $28.7 Million BNSF Bridge Project for Lorenzo Road

Will County Executive Committee Meeting | February 11, 2026 Article Summary: The Executive Committee approved an agreement with BNSF Railway to construct a grade separation bridge on Lorenzo Road in...
Iranians clash with protestors over U.S. strikes

Iranians clash with protestors over U.S. strikes

By Andrew RiceThe Center Square Iranian nationals celebrating the death of Iran’s leader Ayatollah Ali Khamenei on Saturday clashed with protestors criticizing the Trump administration’s military actions in Iran. As...
Trump confirms Khamenei's death, says bombing to continue

Trump confirms Khamenei’s death, says bombing to continue

By Sarah Roderick-FitchThe Center Square The Iranian Supreme Leader Ali Khamenei is dead, President Donald Trump confirmed Saturday. The president made the announcement from his Palm Beach estate via a...
Trump: Ayatollah Khamenei has been killed

Trump: Ayatollah Khamenei has been killed

By Sarah Roderick-FitchThe Center Square President Donald Trump Saturday afternoon Iranian leader Ayatollah Ali Khamenei has been killed. "Khamenei, one of the most evil people in History, is dead," Trump...