Second Solar Farm with Battery Storage Proposed in Green Garden
Article Summary: A second, separate commercial solar project has been proposed in Green Garden Township by Turning Point Energy, adding to residents’ growing concerns about farmland being converted for energy production. The new 72-acre proposal, located at Stunkle and LaGrange Roads, would include battery storage and is projected for 2026.
Turning Point Solar Proposal Key Points:
-
Project Details: The facility would cover approximately 72 acres with 14,000 solar panels and include a battery storage component consisting of eight 20-foot trailers.
-
Location: The proposed site consists of two triangular parcels at the intersection of Stunkle and LaGrange Roads.
-
Developer: The project is proposed by Turning Point Energy, the same company behind a previous solar installation in the township.
GREEN GARDEN TOWNSHIP — As residents mobilize against one massive solar project, Green Garden Township officials revealed that a second, unrelated solar farm is being proposed by a different developer.
Trustee Ralph Deetsz reported during Monday’s board meeting that he and Trustee Monroe Striggow met with representatives from Turning Point Energy on August 28 to discuss a new solar facility with battery storage. The project, nicknamed “Turning Point Two” by Deetsz, would be located on two triangular parcels totaling 72 acres at Stunkle and LaGrange Roads.
The proposal includes approximately 14,000 solar panels and a battery storage system housed in eight 20-foot trailers. Deetsz said the representative, Scott Osborne, indicated the project is planned for 2026 and an application has not yet been filed with the county.
This new proposal is entirely separate from the 600-megawatt facility proposed by Earthwise, which has become a major point of contention in the community. Turning Point Energy previously developed another solar farm in the township.
Deetsz noted that the new project’s location on Stunkle Road could be a factor in its approval, as the board has previously expressed a desire to limit development along that corridor. The proposal adds another layer to the ongoing debate over land use and renewable energy development in the rural township.
Latest News Stories
Trump says U.S. in ‘armed conflict’ with drug cartels in Caribbean
Policy experts unimpressed with SBA’s ‘record’ capital delivered to small businesses
City taxpayer burden swells, as Chicago pension debt rises
Poll: Voters like candidates supporting war on Alzheimer’s
U.S. LNG exports at new record in September on strong Louisiana shipments
Conservatives push Union Pacific–Norfolk Southern merger
Hamas agrees to release hostages; demands further negotiations
Report: Bipartisan support for K-12 open enrollment policy
‘End the political idiocy’: Republicans lambast Dems for tanking funding bill again
WATCH: U.S. military strikes another suspected drug boat, killing four
Des Moines Public School system hired superintendent with extensive criminal history
Pro-life group calls FDA’s approval of generic abortion pill ‘unconscionable’