Screenshot 2025-10-16 at 8.30.46 PM

Green Garden Residents Mobilize Against Massive 18-Square-Mile Solar Facility

Spread the love

Green Garden Township Meeting October 13 @ 7PM

Article Summary: A volunteer citizen group in Green Garden Township has announced a five-phase strategy to stop a massive commercial solar facility proposed by Earthrise Energy, which could cover up to 12,000 acres, or 18 square miles. The group’s chairman, Thomas Becker, detailed plans for legal action, community organizing, and federal appeals to prevent what he termed the “industrialization” of the rural community.

Earthrise Solar Facility Opposition Key Points:

  • Massive Scale: The proposed Earthrise Energy solar facility is estimated to cover between 5,400 and 12,000 acres, equivalent to 18 square miles, and could include up to 1.7 million solar panels.

  • Community Opposition: The Green Garden Watershed Committee, a local volunteer group, is leading a “five-phase strategy” to block the project, citing the preservation of the township’s rural character and prime farmland.

  • Strategy to Stop the Project: The plan includes a petition drive, legal challenges to the eventual application, lobbying the Will County Board, appealing to the U.S. Department of Agriculture, and filing litigation based on constitutional rights.

  • Project Status: Earthrise has not yet filed a formal application with Will County for the special use permit required to build the facility, though it has been acquiring leases and conducting soil testing in the area.

GREEN GARDEN, IL – Residents of Green Garden Township are preparing for a major battle against a proposed commercial solar facility that could transform up to 18 square miles of the rural landscape. At the township board meeting on Monday, October 13, 2025, Thomas Becker, chairman of the volunteer Green Garden Watershed Committee, outlined a comprehensive strategy to stop the project planned by Earthrise Energy.

“That’s 18 square miles of solar panels. We’re not having it,” Becker told the board and assembled residents. “We are in the middle of a beautiful rural residential area and we’re going to preserve that.”

The project, which Becker said was initially described as a 600-megawatt facility, could encompass between 5,400 and 12,000 acres and feature up to 1.7 million solar panels. The proposed footprint stretches from Stuenkel Road to the north, Pauling Road to the south, Center Road to the east, and Scheer Road to the west, impacting Green Garden, Manhattan, and Wilton townships.

Becker detailed a five-phase strategy to defeat the proposal, beginning with a petition drive to demonstrate widespread opposition. “It makes all the difference when you go in a zoning case to say here are the residents. We are opposed,” he urged.

The committee’s plan includes:

  1. A Petition Drive: Collecting signatures from residents throughout Will County to present to zoning officials.

  2. Legal Challenge to the Application: Attacking the sufficiency of Earthrise’s special use permit application once it is filed with Will County.

  3. Lobbying the County Board: Working with representatives like Will County Board member Daniel J. Butler to gain support from board members who will ultimately vote on the project.

  4. Federal Appeal: Taking the case to the U.S. Department of Agriculture in Washington D.C., arguing against the use of prime farmland for solar development.

  5. Litigation: Filing a lawsuit to challenge a 2023 state law signed by Governor J.B. Pritzker that limited local zoning authority over wind and solar projects, which Becker called “patently unconstitutional.”

Becker argued that the project is not just about solar energy but represents the creeping “industrialization of this area,” connecting it to the South Suburban Airport and industrial corridors in Monee, Frankfort, and Manhattan. He speculated the energy generated would likely be sold to power a large data center, not for local use.

Road Commissioner Jim Hilliard confirmed that Earthrise had already contacted him to request a survey of township roads to assess if they could withstand construction vehicles. Hilliard told the company there was “not much to talk about” until a permit is approved and stated he would not meet with company representatives alone in the future.

Residents at the meeting expressed alarm as one landowner reported that Earthrise crews were already pounding galvanized I-beams into the ground in multiple locations last week. Becker noted that soil testing is required for the application process, but the purpose of the beams was unclear.

“This is a significant circumstance in our lifetime,” Becker said. “How are we going to hand over Green Garden Township to the next generation? We are going to hand over the beautiful area that we have… we’re not going to lose it.”

Leave a Comment





Latest News Stories

IL advocates warn permanent mail-in ballots could be exploited

IL advocates warn permanent mail-in ballots could be exploited

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Illinois election integrity advocates are raising concerns about the state’s permanent mail-in ballot program in the...
Illinois Quick Hits: State spends $87M on ISU fine arts project

Illinois Quick Hits: State spends $87M on ISU fine arts project

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Illinois Gov. J.B. Pritzker joined officials at Illinois State University on Tuesday to break ground on the...
Will County Board Graphic.03

Executive Committee: Relaxes Rules for Retiring Employee Proclamations

Will County Board Executive Committee Meeting | January 8, 2026 Article Summary: The Executive Committee voted to amend county board rules to allow proclamations honoring retiring county employees to pass...
Will County Board Graphic.02

Lobbyist Updates: State Session Resumes; Transit Safety Concerns Raised

Will County Board Legislative Committee Meeting | January 6, 2026 Article Summary: State lobbyists briefed the Will County Legislative Committee on the upcoming General Assembly session, noting a likely focus...
Will County Finance Logo

Meeting Summary and Briefs: Will County Board Finance Committee for January 6, 2026

Will County Board Finance Committee Meeting | January 6, 2026 Meeting SummaryThe Will County Board Finance Committee met on Tuesday, January 6, 2026, to handle a light agenda of routine...
Green Garden Graphic.3

Watershed Committee Vows Litigation if County Approves Massive Earthrise Solar Project

Green Garden Township Board Meeting | January 12, 2026 Article Summary: The Green Garden Township Board received a stark warning regarding the proposed Earthrise solar facility, with the Watershed Committee...
Will County Board Graphic.04

Capital Imp Committee: Facilities Director Reports on VAC Progress and Critical Health Department Elevator Repairs

Capital Improvements & IT Committee Meeting | January 6, 2026 Article Summary:Facilities Director Bill Fern provided updates on major renovation projects, including the completion of the Court Annex and the...
Will County Board Graphic.01

‘Good Food For All’ Initiative Proposes Local Agricultural Asset Mapping for Will County

Will County Board Public Health & Safety Committee Meeting | January 7, 2026 Article Summary: Bob Heuer of HNA Networks presented a "Good Food For All" initiative to the Public...
Will County Board Graphic.03

Public Works Committee Advances $3.2 Million Engineering Contract for Mills Road Reconstruction

Will County Public Works & Transportation Committee Meeting | January 6, 2026 Article Summary: The committee forwarded a resolution to award a $3.2 million contract to HDR Engineering, Inc. for...
Will County Board Graphic.04

Board Members Debate “Commitment to Truth” in Media Resolution

Will County Board Legislative Committee Meeting | January 6, 2026 Article Summary: A proposal to demand the reinstatement of the "Fairness Doctrine" for news media sparked a philosophical debate on...
Will County Board Graphic.01

Executive Committee: Speaker VanDuyne and Member Butler Clash Over Removal of Committee Chair

Will County Board Executive Committee Meeting | January 8, 2026 Article Summary: A heated exchange erupted during the January 8 Executive Committee meeting when Member Daniel Butler challenged Speaker Joe...
Will County Finance Logo

Finance Committee: County Appropriates Fees from $25 Million Wilmington Warehouse Project

Will County Board Finance Committee Meeting | January 6, 2026 Article Summary: The Finance Committee approved the appropriation of an administrative fee tied to a major industrial renovation in Wilmington....
Everyday Economics: A stalled labor market and why the next data points matter

Everyday Economics: A stalled labor market and why the next data points matter

By Orphe DivounguyThe Center Square Last week’s jobs report wasn’t a “good” report, but it wasn’t a collapse either. Payrolls are still growing modestly, and the unemployment rate hasn’t spiked....
Assaults against ICE up 1300%, vehicular attacks up 3200%, death threats up 8000%

Assaults against ICE up 1300%, vehicular attacks up 3200%, death threats up 8000%

By Bethany BlankleyThe Center Square Assaults against U.S. Immigration and Customs Enforcement officers are up 1,300%, vehicular attacks are up 3,200% and death threats are up 8,000%, the Department of...
Bipartisan bill to cap annual deficits at 3% could curb debt growth

Bipartisan bill to cap annual deficits at 3% could curb debt growth

By Brett RowlandThe Center Square Lawmakers introduced a bipartisan proposal to cap annual deficits at 3% of GDP, but this resolution would still permit spending beyond annual revenue. House Resolution...