Engineering Firm Hired for Gougar Road Bridge Replacement
Will County Board Meeting | November 2025
Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian National Railroad in New Lenox. The project aims to improve safety and traffic flow at a critical infrastructure point.
Gougar Road Bridge Key Points:
-
Project: Phase II Design Engineering for the Gougar Road Bridge (County Highway 52).
-
Location: Gougar Road over the Canadian National (CN) Railroad tracks in New Lenox Township.
-
Cost: $301,703.00.
-
Contractor: A. Epstein and Sons International, Inc.
-
Scope: The firm will design a new structure and roadway approaches to replace the existing infrastructure.
JOLIET – Will County is moving forward with plans to replace the Gougar Road bridge over the Canadian National Railroad in New Lenox, authorizing a significant engineering contract on Thursday.
The Board approved a supplemental professional services agreement with A. Epstein and Sons International, Inc. valued at $301,703. The firm is tasked with “Phase II” design engineering, which involves creating the final contract plans, easement documents, and right-of-way plats necessary for construction.
The project targets a section of Gougar Road (County Highway 52) that serves as a key artery in District 2. The current structure over the CN tracks has been identified for replacement to meet modern traffic and safety standards.
Funding for the engineering work will come from a combination of sources, potentially including the Illinois Commerce Commission Grade Crossing Protection Fund, County RTA Tax funds, and County Motor Fuel Tax funds.
This design phase is a critical precursor to construction. Once A. Epstein and Sons completes the structural and roadway design, the county will be positioned to bid the project for construction, likely in a future fiscal year.
Latest News Stories
Will County Board Approves New Fee Schedule for Recorder of Deeds
WATCH: IL child welfare interns debate heats up; state financial audit released
Georgia ICE arrests up 367 percent from 2021, making for ‘safer streets, open jobs
Will County Board Formally Opposes Heavier, Longer Trucks on National Roadways
Illinois quick hits: CUB challenges Ameren rate hike plan
Will County Board Approves Permits for Landscaping Business and Restaurant Liquor Service in Frankfort Area
Crete Township Community Center to Get New Digital Sign
Will County Awards $1.46 Million Contract for Kankakee Street Bridge Replacement in Manhattan Township
Board Approves Engineering Contracts for Mokena Road Widening
Experts call for probe after Microsoft left out China ties in Pentagon security plan
FBI raids the home of John Bolton
Will County Executive Proposes $791 Million Budget Focused on Stability Amidst Economic Uncertainty