—Photo by Glenn P. Knoblock

Forest Preserve District Advances Major Extensions and Repairs on Plum Creek Greenway Trail in Crete Township

Spread the love

Article Summary: The Forest Preserve District is currently undertaking dual construction projects on the Plum Creek Greenway Trail, initiating a massive 1.5-mile southern extension through Plum Valley Preserve and commencing repairs on an 80-foot bridge damaged by a fallen tree in Goodenow Grove Nature Preserve.

Plum Creek Greenway Trail Projects Key Points:

  • A new 1.5-mile trail extension will connect Plum Valley Preserve to Goodenow Grove Nature Preserve in Crete Township, with an estimated completion date of fall 2026.

  • The extension features the installation of 800 feet of elevated concrete boardwalks and a 150-foot bridge over Plum Creek, which will become the District’s largest single-span bridge.

  • Repairs began in early March on an 80-foot bridge in Goodenow Grove that was heavily damaged by a fallen tree in January 2025. Contractors are installing new footings, supports, and decking.

  • Future phases of the trail extension aim to connect the path north into Cook County and south to Beecher via the proposed Vincennes Trail.

  • The projects are locally funded by the Forest Preserve District’s Capital Improvement Program and a 2024–2028 grant from the Chicago Metropolitan Agency for Planning.

The Forest Preserve District announced in early March that dual construction projects are currently underway to expand and repair the Plum Creek Greenway Trail, promising significant upgrades for outdoor recreation in Crete Township and the surrounding Will County communities.

The most expansive of the two projects is a new 1.5-mile trail extension that will head south, winding through a hilly section of Plum Valley Preserve. The new multi-use trail will feature a 10-foot-wide path with 3-foot turf shoulders on each side. The extension will consist of a half-mile of crushed limestone, a half-mile of asphalt, and a half-mile street route.

The short street connection will be marked with explicit street signs and pavement directions, leading path users from the newly built trail section to an existing 3.15-mile leg of the Plum Creek Greenway Trail at Goodenow Grove Nature Preserve. The new construction is being added to an existing 1-mile crushed limestone segment that extends south from the Plum Valley Preserve entrance and dog park.

“Upon completion, the project will eliminate a gap in the existing trail system, resulting in a continuous greenway trail connection between Goodenow Grove Nature Preserve and the Plum Valley Preserve – Burville Road access,” said Colleen Novander, the Forest Preserve District’s director of planning and land preservation.

To navigate sensitive ecological areas, contractors are actively installing sections of a precast concrete pedestrian boardwalk to elevate the path. Crews will lay down one 600-foot section and another 200-foot section of boardwalk, utilizing massive concrete components that weigh 4,000 pounds each.

Additionally, concrete abutments are being poured and cured to support a new bridge spanning Plum Creek. Expected to be installed later in April, the 150-foot structure will be the largest single-span bridge in the District.

To minimize environmental impact to existing natural features like wetlands, ravines, and sensitive habitats, the engineering phase dictated that construction remain confined to a designated corridor with a maximum width of 100 feet.

The extension project, which carries an estimated completion date of fall 2026, is funded by the Forest Preserve District’s Capital Improvement Program. Supplemental funding support is provided through the Chicago Metropolitan Agency for Planning’s (CMAP) 2024–2028 Locally Programmed Transportation Alternatives Program (TAP-L).

Looking ahead, District officials noted that future phases of the trail will provide a critical north–south connection, eventually extending the path north into Cook County and south to the Village of Beecher via the proposed Vincennes Trail.

Goodenow Grove Bridge Repairs
While the extension moves forward, a separate set of contractors began repair work in early March on an existing bridge located in the eastern section of Goodenow Grove Nature Preserve, near East Bemes Road.

The 80-foot bridge, which sits just north of the preserve’s well-known “big bridge,” was significantly damaged in January 2025 when a large tree fell on the structure. Following the incident, the District consulted engineers to determine if the bridge required a total replacement or if it could be salvaged. Engineers ultimately concluded that the structure could be repaired.

Originally built in 2011 in tandem with the initial construction of the Plum Creek Greenway Trail and a capital redesign project at Goodenow Grove, the bridge requires extensive rehabilitation. Contractors are currently replacing one of the bridge’s main support structures and pouring new concrete footings. Additionally, all of the bridge’s decking and railings will be entirely replaced.

“It will look like a brand new bridge,” stated Chris Moeller, a Forest Preserve operations department supervisor.

The section of the Plum Creek Greenway Trail affected by the damage has been closed to the public since the tree fell in January. District officials anticipate the repairs will take several weeks to complete, noting that weather and other factors could impact the timeline. The trail segment will officially reopen once the reconstruction is finalized.

—Photo by Glenn P. Knoblock

Leave a Comment





Latest News Stories

Will County Board Graphic.04

Draft County Federal Agenda Opposes Sharing Medicaid Patient Data with ICE

Article Summary: A proposed federal policy platform presented to the Will County Board takes a hard line against a federal agreement that allows Immigration and Customs Enforcement (ICE) to access...
Meeting Briefs

Meeting Summary and Briefs: Green Garden Township Board for January 12, 2026

Green Garden Township Board Meeting | January 12, 2026 The Green Garden Township Board met on Monday, January 12, 2026, to handle routine business and receive updates on major infrastructure...
Will County Logo Graphic

Northern Builders Development Brings Changes to Laraway and Gougar Roads in New Lenox

Will County Board Meeting | January 15, 2026 Article Summary: The Will County Board approved access permits for a new development by Northern Builders at the intersection of Laraway Road...

Meeting Summary and Briefs: Will County Public Works & Transportation Committee for January 6, 2026

Will County Public Works & Transportation Committee Meeting | January 6, 2026 Meeting SummaryThe Will County Board Public Works & Transportation Committee met on Tuesday, January 6, 2026, to discuss...
SCOTUS to hear Fed firing case Wednesday

SCOTUS to hear Fed firing case Wednesday

By Andrew RiceThe Center Square The U.S. Supreme Court will hear arguments on Wednesday to decide whether President Donald Trump can fire Lisa Cook, a member of the Federal Reserve...
Committee highlights failures of Afghan vetting, as funding for refugees in limbo

Committee highlights failures of Afghan vetting, as funding for refugees in limbo

By Sarah Roderick-FitchThe Center Square Amid a scathing committee hearing on the vetting process of Afghan parolees under the Biden administration, nearly $6 billion in continual funding for refugees is...
Will County Board Graphic.03

County Board Debates Legislative Agendas; State Agenda Passes, Federal Agenda Sent Back

Will County Board Meeting | January 15, 2026 Article Summary: The Will County Board engaged in a vigorous and at times confusing debate over its 2026 legislative priorities, ultimately passing...
lincoln way school district 210 logo.1

District 210 Updates Online Course Policy and Increases Summer School Fees

Lincoln-Way 210 Board of Education Meeting | Jan. 15, 2026 Article Summary: The Board of Education approved an increase in summer school fees and clarified policies regarding online coursework for...
Congratulations to Corporal Kurtis Ingram

Corporal Ingram completes elite leadership training program

Corporal Kurtis Ingram has successfully completed the School of Police Staff and Command (SPSC) at Northwestern University’s Center for Public Safety. The SPSC is an intensive 10-week program focused on...
Meeting Briefs

Meeting Summary and Briefs: Will County Board Executive Committee for January 8, 2026

Will County Board Executive Committee Meeting | January 8, 2026 Overall Meeting SummaryThe Will County Board Executive Committee met on Thursday, January 8, 2026, tackling a heavy agenda that included...
EU threatens to blow up trade deal over Trump's plans for Greenland

EU threatens to blow up trade deal over Trump’s plans for Greenland

By Brett RowlandThe Center Square A top European official said President Donald Trump's comments could sink a trade deal between the U.S. and the 27-nation European Union. Manfred Weber, president...
The fire at Woldhuis Sunrise Greenhouse had the mutual aid of 19 other agencies-photo courtesy Woldhuis.

Blaze Destroys Building and Food Truck at Woldhuis Sunrise Nursery

By Andrea Arens A massive fire tore through Woldhuis Sunrise Nursery late Thursday morning, destroying one greenhouse building, a food truck, damaging another building and drawing firefighters from across the...
Q1 border crossings plummet 95% from Biden era, lowest in history

Q1 border crossings plummet 95% from Biden era, lowest in history

By Bethany BlankleyThe Center Square The lowest number of illegal border crossings were reported for the first quarter of a fiscal year in U.S. history in President Donald Trump’s first...
Trump says Europe will face tariffs until Denmark gives up Greenland

Trump says Europe will face tariffs until Denmark gives up Greenland

By Brett RowlandThe Center Square President Donald Trump said Saturday that he will impose fresh tariffs on European countries until the U.S. reaches a deal to annex Greenland. Trump said...
Senate takes recess, leaving only five days to pass six govt funding bills

Senate takes recess, leaving only five days to pass six govt funding bills

By Thérèse BoudreauxThe Center Square U.S. senators have left town for a week-long recess, leaving themselves only five days to pass the six remaining federal government funding bills. Congress is...