Will County Board Graphic.03

Will County Approves $2.9 Million Engineering Contract for Bluff Road Reconstruction in Channahon

Spread the love

Will County Public Works & Transportation Committee Meeting | April 7, 2026

Article Summary: The county is advancing a massive overhaul of Bluff Road in Channahon, approving a nearly $3 million Phase I and II engineering contract to prepare the corridor for full reconstruction, storm sewers, and potential retaining walls.

Bluff Road Engineering Key Points:

  • The committee approved a $2,955,607 contract with Peralte-Clark, LLC.

  • The project covers Bluff Road (CH 77) from the I-55 West Frontage Road to US Route 6.

  • The design will convert the existing rural, ditch-lined road into an urban cross-section with curb, gutter, and storm sewers.

  • The contract includes extensive geotechnical and environmental investigations due to the likelihood of encountering shallow bedrock and utility conflicts.

The Will County Board Public Works & Transportation Committee on Tuesday, April 7, 2026, unanimously approved a sweeping $2,955,607 professional services agreement with Peralte-Clark, LLC to engineer the total reconstruction of Bluff Road in Channahon.

The project targets a 5,900-foot, 1.1-mile stretch of Bluff Road (County Highway 77) between US Route 6 and the West Frontage Road of Interstate 55. Currently a two-lane major collector carrying roughly 5,850 vehicles per day, the roadway suffers from pavement deterioration, geometric deficiencies, and drainage issues.

According to the project scope detailed in the agenda packet, Peralte-Clark will guide the project through both Phase I (Preliminary & Environmental Engineering) and Phase II (Design Engineering). The ultimate goal is to convert the existing rural cross-section—characterized by aggregate shoulders and open ditches—into a modernized urban section featuring concrete curbs, gutters, and an enclosed storm sewer system.

The engineering task is highly complex due to the corridor’s specific geography. The contract includes significant subsurface investigations by subconsultants to identify areas of shallow bedrock, which could severely impact drainage design, excavation costs, and the placement of proposed retaining walls.

The Phase I study will evaluate up to four geometric alternatives, including two-lane and three-lane configurations, while also designing pedestrian and bicycle accommodations. The engineering team will also be required to navigate substantial utility conflicts, requiring a dedicated Subsurface Utility Engineering (SUE) evaluation.

The $2.95 million contract will be funded through a combination of County Motor Fuel Tax, RTA Tax, Highway Tax, and Matching Tax funds. According to the preliminary schedule, Phase II design is slated for completion by March 2027, with construction potentially beginning in June 2027.

Leave a Comment





Latest News Stories

Illinois quick hits: Record infrastructure spending planned; watchdog urges ratepayers review Ameren bills

Illinois quick hits: Record infrastructure spending planned; watchdog urges ratepayers review Ameren bills

By Jim Talamonti | The Center SquareThe Center Square Record infrastructure spending planned Gov. J.B. Pritzker and the Illinois Department of Transportation joined state, local and organized labor officials to...
GOP rep, Dem alderman: Sanctuary policies drove immigration enforcement surge

GOP rep, Dem alderman: Sanctuary policies drove immigration enforcement surge

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – A Republican state lawmaker and a Democratic Chicago alderman agree that sanctuary policies are the reason federal...
WATCH: Labor leaving agreed-bill process has consequences, Illinois legislator warns

WATCH: Labor leaving agreed-bill process has consequences, Illinois legislator warns

By Greg Bishop | The Center SquareThe Center Square (The Center Square) − Illinois Gov. J.B. Pritzker says he understands why labor leaders are walking away from the agreed-bill process,...
Screenshot 2025-10-17 at 10.40.49 AM

Peotone School Committee Scrambles for Cuts After Budget Fails Amid Financial Crisis

207U Committee of the Whole Meeting 9/22/2025 Article Summary: Following the failure of the proposed 2025-2026 budget to pass, the Peotone Board of Education is directing its administration to formulate...
lincoln way school district 210 logo.1

Lincoln-Way 210 to Launch District Literacy Plan, Expands Community Partnerships

Article Summary: As part of its strategic plan, Lincoln-Way High School District 210 is developing a comprehensive literacy plan to embed critical thinking skills across the curriculum. The district is also...
Pipeline expansion touted as key to U.S. energy dominance

Pipeline expansion touted as key to U.S. energy dominance

By Lauren JessopThe Center Square Pipeline expansion across the Appalachian Basin holds the key to solving the nation’s energy crisis, according to industry experts, though state policies and regulatory hurdles...
WCO 2025-09-27 at 9.05.04 AM

County Board Abates Over $25 Million in Property Taxes for Bond Payments

Article Summary: Will County property taxpayers will be spared over $25 million in taxes for the 2026 payment year after the County Board voted to abate taxes for six separate...
Illinois quick hits: EV rebate applications opens Oct. 28; Chicago speed camera tickets spike

Illinois quick hits: EV rebate applications opens Oct. 28; Chicago speed camera tickets spike

By Jim Talamonti | The Center SquareThe Center Square EV rebate applications opens Oct. 28 The Illinois Environmental Protection Agency announced that dates for the next EV Rebate Program application...
WATCH: Pritzker expects troops soon, protesters with guns charged; Darren Bailey reacts

WATCH: Pritzker expects troops soon, protesters with guns charged; Darren Bailey reacts

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop shares comments from...
Screenshot

Lincoln-Way 210 Prepares for “Retirement Wave” with Focus on Recruitment

Article Summary: Lincoln-Way High School District 210 is bracing for a significant number of retirements, with 47 teachers expected to leave over the next four years, representing nearly a quarter of...
Report says Arizona school superintendents pad their pay

Report says Arizona school superintendents pad their pay

By Esther WickhamThe Center Square Arizona school superintendents are inflating taxpayer costs with salaries, lavish benefits and secretive compensation packages, a new report reveals. A Goldwater Institute report, “The Hidden...
Trump administration takes Nevada off sanctuary state list

Trump administration takes Nevada off sanctuary state list

By Liam HibbertThe Center Square After Republican Gov. Joe Lombardo's agreement to full federal cooperation on immigration enforcement, Nevada becomes the first state removed from the Trump administration's sanctuary jurisdiction...
Candidates favor Medi-Cal for illegal immigrants

Candidates favor Medi-Cal for illegal immigrants

By Dave MasonThe Center Square Democratic gubernatorial candidates during a forum Sunday favored continuing Medi-Cal benefits for illegal immigrants in California despite the $12.1 billion price tag for taxpayers. And...
DOE to invest $625 million to keep coal plants running

DOE to invest $625 million to keep coal plants running

By Tom JoyceThe Center Square The U.S. Department of Energy said Monday it will spend $625 million on upgrades designed to keep coal plants online. It’s part of an effort...
Arizona congressman proposes coin to honor Charlie Kirk

Arizona congressman proposes coin to honor Charlie Kirk

By Chris WoodwardThe Center Square U.S. Rep. Abe Hamadeh, R-Arizona, has introduced a bill creating a commemorative coin honoring Charlie Kirk. A native of Illinois, Kirk had a home in...