Will County P&Z Logo Planning Zoning.2

Zinc Leaching and Flooding Concerns Dominate Testimony at Will County Solar Hearing

Spread the love

Will County Board Special Planning and Zoning Commission Meeting | May 12, 2026

Article Summary: Expert and resident testimonies during Tuesday’s Planning and Zoning Commission meeting highlighted severe concerns over groundwater contamination and flooding if a 6,000-acre solar farm is built on hydric soils.

Environmental Impact Key Points:

  • A Will-South Cook Soil and Water Conservation District report (NRI #5824) classified the site as “essential farmland” with a LESA score of 236.

  • Approximately 2,152 acres of the proposed site contain hydric soils that present a high risk for steel corrosion.

  • A foundation drilling expert testified that driving raw galvanized steel posts into hydric soil could cause rapid corrosion, risking zinc leaching into local aquifers.

  • Residents from Green Garden Township presented video evidence of existing severe flooding on parcels adjacent to the proposed solar arrays.

A debate over soil chemistry, galvanized steel, and floodplains took center stage at the Will County Planning and Zoning Commission on Tuesday, May 12, 2026, as residents and experts warned of potential environmental disasters from the proposed Earthrise solar project.

During the court-ordered cross-examination hearing, plaintiffs focused heavily on Natural Resource Information Report #5824, prepared by the Will-South Cook Soil and Water Conservation District. The report calculated a Land Evaluation and Site Assessment (LESA) score of 236 for the property—classifying it as essential farmland—and noted that approximately 2,152 acres of the site consist of hydric soils.

Crucially, the report indicated that the site presents a “high” risk for steel corrosion. Plaintiff Attorney Steven Becker questioned Earthrise developers on their plan to drive an estimated 300,000 bare galvanized steel posts into the ground to support the 1.19 million solar modules.

To support the plaintiffs’ claims, Melissa Eager, an operating engineer with 30 years of experience in the caisson drilling industry, testified about the dangers of placing untreated steel into wet soils.

“Anything put into ground that is wet is going to eventually leach out,” Eager testified. “A pinhole into that galvanization will corrode… when put in a hydric soil or wet locations it’s usually anywhere from 3 to 5 years.”

Eager suggested that the posts should be coated in epoxy or encased in concrete. However, she warned that using heavy machinery to encase thousands of posts in concrete would heavily compact the area’s silty loam soil, creating a “hard pan” that would drastically increase surface erosion and water runoff.

Earthrise Lead Developer Robert Kalbouss and attorney Ben Jacobi refuted the claims, relying on prior testimony from their environmental scientist, Dr. Chris Olsen. Jacobi stated that any leaching from the galvanized steel would be minimal and isolated directly next to the pile, posing no threat to crops or groundwater.

“There is no evidence of or documented evidence of steel piles from solar facilities leaching into the groundwater. It doesn’t exist,” Jacobi said. “We don’t believe that our construction methods pose a risk to public health or agriculture.”

The potential for exacerbated runoff struck a nerve with neighboring property owners. Green Garden Township residents Jim Michalewicz and Donna Robinson presented photographs and video footage showing substantial standing water and flooding on their properties, which abut the proposed solar parcels.

Robinson showed video of her yard flooding on three sides, noting that neighboring landowners had failed to maintain culverts, causing water to back up onto her property. She expressed deep concern that industrial development on the adjacent fields would push even more water into her yard.

Becker underscored these concerns, pointing out that the Earthrise project footprint sits near the headwaters of Fork Creek, Prairie Creek, and Hickory Creek. He warned the commission that any groundwater contamination could easily travel into these tributaries, potentially violating the federal Clean Water Act.

Leave a Comment





Latest News Stories

frankfort-square-park-district.1

Park District Awards Eight Scholarships to Lincoln-Way East Seniors

The Frankfort Square Park District awarded $1,000 scholarships to eight graduating seniors from Lincoln-Way East High School at the school’s Community Scholarship Night on May 7. Park Board Commissioners Frank...
will-county-board.3

Transportation Projects Advance as Board Approves Vision Zero, Road Improvements

County adopts traffic safety initiative while funding major infrastructure upgrades The Will County Board approved a comprehensive transportation agenda including adoption of Vision Zero principles and multiple road improvement projects...
County-Board-Room

Health Department Receives Budget Boost, Sunny Hill Admission Policy Updated

Board approves funding increases and policy changes for county health services The Will County Board approved budget appropriations for the health department and updated admission policies for Sunny Hill Nursing...
Meeting-Briefs

Meeting Briefs: Frankfort Square Park District for May 15, 2025

At its annual organizational meeting, the Frankfort Square Park District Board of Commissioners swore in four members, re-elected its leadership, and reviewed its strong end-of-year financial report. The district’s funds...
Screenshot-2025-06-05-at-1.43.14 PM-2

Board Meeting Shorts

Budget Amendment Approved: The board approved amendments to the fiscal year 2025 budget totaling $121.7 million in revenue and $120.1 million in expenses. Changes primarily reflect bond proceeds and related...
Screenshot-2025-06-16-at-3.26.08-PM-1

Will County Board Meeting Briefs Package

COUNTY APPOINTMENTS Fire Protection District: Board approved county executive appointments to Manhattan Fire Protection District board. Agricultural Committee: Approved appointment to Agricultural Area Committee with Member Judy Ogala abstaining due...
frankfort-park-district.1

Frankfort Park District Reorganizes Board, Explores Options for Tax-Impacting Projects

FRANKFORT – The Frankfort Park District Board seated its re-elected members, reorganized its leadership, and approved its new annual budget on Tuesday, while also revealing it is actively exploring options...
frankfort-park-district

Aging Sara Park Building Poses Challenge for Park District

The Frankfort Park District is grappling with how to address the deteriorating Sara Park building, whose roof is in "bad shape" and whose location within a flood plain complicates any...
frankfort-park-district.1

Meeting Briefs: Frankfort Park District Board for May 13, 2025

The Frankfort Park District Board of Commissioners re-elected its leadership team for a new term and approved its fiscal year 2025-2026 budget at its meeting on Tuesday. The board also...
Green-Garden-Logo.WP

Township Board Unites Against State Consolidation Efforts

GREEN GARDEN TOWNSHIP — The Green Garden Township Board voted unanimously to oppose state legislation that would consolidate township governments, amending the Annual Town Meeting agenda to include a resolution...
Green-Garden-Logo.WP

Planning Commission Outlines Three-Step Process for Land Use Plan

GREEN GARDEN TOWNSHIP — The Green Garden Township Planning Commission has established a three-step process for developing the township's new land use plan, with public input opportunities scheduled throughout spring,...
Green-Garden-Logo.WP

Road Projects Face Delays as Commissioner Reports Solar Leases on Needed Land

GREEN GARDEN TOWNSHIP — The planned Sheer Road bridge replacement project has been pushed back to 2026 due to utility issues, and negotiations for needed easements are complicated by solar...
Green-Garden-Logo.WP

Green Garden Township News Briefs – March 2025

Township Property Values Continue Rising: Assessor Bushong reported Green Garden Township's equalized assessed value (EAV) continues to grow rapidly, increasing by $2.5 million in just the first two months of...
Peotone-High-School-scaled-2

Peotone School Board Approves New Curriculum, Welcomes New Administrators

The Peotone Community Unit School District 207U Board of Education approved a new K-5 English Language Arts curriculum and introduced two new administrators during its April 23 meeting at Peotone...
Peotone-School-District

Peotone Students Honored for Academic and Athletic Achievements

The Peotone Board of Education recognized numerous students for their academic and athletic accomplishments during the April 23 meeting. High school sophomore Olivia Robinson was honored as the March Student...