Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Spread the love

Will County Planning and Zoning Commission Meeting | November 18, 2025

Article Summary:
The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial solar energy facility in New Lenox Township. The extension provides the developer, Greenpath New Lenox LandCo LLC, with the necessary time to prepare the site for planting pollinator-friendly ground cover in the spring of 2026.

Solar Farm Variance Extension Key Points:

  • Location: Vacant property on South Spencer Road, New Lenox Township.

  • Project: A 4.95-megawatt commercial solar energy facility.

  • Variances Extended: Four variances related to increasing ground cover height to 36 inches and reducing required mowings from five times to one time per year.

  • New Expiration Date: The variances will now expire on August 16, 2026.

JOLIET, IL – A commercial solar energy project planned for New Lenox Township received a procedural green light on Tuesday, November 18, 2025, as the Will County Planning and Zoning Commission granted a six-month extension for its previously approved zoning variances.

The applicant, Greenpath New Lenox LandCo LLC, requested the 180-day extension to prevent the variances from expiring on February 18, 2026. According to a staff memo, favorable planting conditions for the pollinator-friendly ground cover planned for the site are not expected until after that date. The extension was the first of two possible 180-day extensions allowed by the ordinance.

The commission originally approved the variances in February 2025. They allow the developer to increase the maximum height of ground cover plants from 13 inches to 36 inches and reduce the number of required mowings from five times per year to just once. These changes are designed to support the establishment of a native pollinator habitat on the site, a practice encouraged by the Illinois Pollinator-Friendly Solar Site Act.

The project involves two parcels on South Spencer Road and is planned as a 4.95 MWac commercial solar energy facility. With the unanimous approval of the extension, the variances will now remain valid until August 16, 2026, allowing the developer to proceed with site preparation and planting in the spring.

Events

No events

Leave a Comment





Latest News Stories

Screenshot 2025-09-23 at 8.31.05 PM

Second Solar Farm with Battery Storage Proposed in Green Garden

Article Summary: A second, separate commercial solar project has been proposed in Green Garden Township by Turning Point Energy, adding to residents' growing concerns about farmland being converted for energy...
Meeting-Briefs-1

Meeting Summary and Briefs: Green Garden Township Board for September 8, 2025

The Green Garden Township Board meeting on September 8 was dominated by major developments concerning two separate large-scale solar farm proposals and a dramatic, last-minute reversal on grant funding for...
Joliet-Junior-college.-Graphic-Logo.3

JJC Moves Forward with Major Technology Overhaul to Modernize College Operations

Article Summary: The Joliet Junior College Board of Trustees received a detailed update on a sweeping Enterprise Resource Planning (ERP) project, a major initiative designed to modernize the college's core...
Joliet-Junior-college.-Graphic-Logo.2

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for August 20, 2025

The Joliet Junior College Board of Trustees focused on a major technological overhaul, celebrated milestones in student support, and addressed internal governance issues at its regular meeting on August 20,...
Joliet-Junior-college.-Graphic-Logo.4

Tensions Flare as JJC Chairman Rebukes “Entitlement” After Trustee Lists Demands

Article Summary: Apparent tensions on the Joliet Junior College Board of Trustees surfaced during its meeting on Wednesday, August 20, 2025, when one trustee requested to be returned to "good...
Meeting Briefs

Meeting Summary and Briefs: Green Garden Township for August 25, 2025

The Green Garden Township Board held a workshop meeting on August 25, 2025, with the agenda dominated by a detailed presentation of a new draft Land Use Plan. The Plan...
DOJ urges federal judge to strike down climate change law

DOJ urges federal judge to strike down climate change law

By Chris WadeThe Center Square The Trump administration is asking a federal judge to invalidate a New York law that seeks to punish fossil fuel companies for their alleged role...
WATCH: Newsom deploys state police to help local law enforcement

WATCH: Newsom deploys state police to help local law enforcement

By Dave MasonThe Center Square New California Highway Patrol teams will work with local law enforcement to fight crime in Los Angeles, San Diego, Sacramento, the San Francisco Bay Area,...
Appeals court rejects Trump's tariffs, but leaves them in place

Appeals court rejects Trump’s tariffs, but leaves them in place

By Brett RowlandThe Center Square A federal appeals court said Friday that President Donald Trump doesn't have the authority to issue blanket tariffs, in a blow to the president's domestic...
Denver Public Schools accused of violating Title IX

Denver Public Schools accused of violating Title IX

By Esther WickhamThe Center Square The U.S. Department of Education for Civil Rights announced this week that Denver Public Schools' policies on “all-gender” facilities violate Title IX. The department's Office...
Poll: 41% of parents worried about school safety before Minneapolis shooting

Poll: 41% of parents worried about school safety before Minneapolis shooting

By Morgan SweeneyThe Center Square Four in 10 parents of K-12 students are worried for their children’s safety at school, according to a new Gallup poll. The poll was collected...
Report: Offshore wind critics played role in Revolution Wind work stoppage

Report: Offshore wind critics played role in Revolution Wind work stoppage

By Tom JoyceThe Center Square Offshore wind opponents in the fishing industry helped shape the Trump administration’s decision to halt work on the Revolution Wind project, a $4 billion development...
Nevada governor addresses statewide cyberattack

Nevada governor addresses statewide cyberattack

By Liam HibbertThe Center Square Nevada Gov. Joe Lombardo spoke publicly for the first time on a cyberattack that shut down government websites and kept state employees at home, four...
Illinois quick hits: Mine manager pleads guilty; Johnson issues food executive order

Illinois quick hits: Mine manager pleads guilty; Johnson issues food executive order

By Jim Talamonti | The Center SquareThe Center Square Mine manager pleads guilty A former Franklin County mine manager has pleaded guilty to conspiring to defraud the U.S. Mine Safety...
Op-Ed: Chicago-area transit needs an intervention, not another fix

Op-Ed: Chicago-area transit needs an intervention, not another fix

By Brad Weisenstein | The Center Square contributorThe Center Square If Illinois were a family, it would have 1,313 siblings – its cities, towns and villages. One of them is...