Screenshot 2025-10-17 at 11.04.41 AM

Safety Surveys Reveal Over $570,000 in Needed Repairs at Peotone Schools

Spread the love

207U School Regular Board Meeting September 22, 2025

Article Summary: Ten-year health and life safety surveys for four Peotone school buildings have identified a combined total of over $570,000 in recommended repairs and updates. The Board of Education approved the reports, which detail dozens of deficiencies ranging from fire safety issues and electrical problems to needed masonry work.

School Safety Survey Key Points:

  • Reports Approved: The Peotone Board of Education formally approved the 2025 10-year health and life safety survey reports for four of its school buildings.

  • Total Cost: The estimated cost to address all identified issues across Connor Shaw Center, Peotone Elementary, Peotone Intermediate, and Peotone Junior High totals $571,200.

  • Identified Issues: Violations include missing fire-rated glazing, inoperable door closers on fire-rated doors, electrical panel issues, deteriorated masonry, and inadequate exhaust hoods.

  • Next Steps: The district will use these reports, completed by Healy, Bender, Patton, and Been Architects, to plan for necessary remediation work with its new architectural firm, Wight & Co.

PEOTONE, IL – Required 10-year safety surveys have uncovered more than half a million dollars in needed repairs across four schools in Peotone School District 207U, according to reports approved by the Board of Education on Monday, September 22, 2025.

The health and life safety reports, conducted by the architectural firm Healy, Bender, Patton, and Been, identified dozens of violations and recommended corrections totaling an estimated $571,200. The surveys covered Connor Shaw Center (CSC), Peotone Elementary School (PES), Peotone Intermediate Center (PIC), and Peotone Junior High School (PJHS).

The estimated costs for repairs are broken down by school:

  • Peotone Elementary School: $199,260

  • Peotone Junior High School: $162,540

  • Peotone Intermediate Center: $116,220

  • Connor Shaw Center: $93,180

Among the most expensive items are significant fire safety upgrades. At PES, replacing glazing with 20-minute fire-rated glass and blanking off a louver in a fire-rated partition are estimated to cost a combined $50,500. At PJHS, installing panic hardware on fire-rated doors is estimated at $32,000, and providing new door closers is estimated at $27,300. Another major project identified at PIC is a $45,000 exhaust hood for the 6-burner range in the kitchen.

Other deficiencies across the buildings include deteriorated electrical panels, missing exit signs, open junction boxes, cracked exterior bricks allowing water penetration, and items stored improperly in boiler rooms or too close to ceilings.

The board approved the reports unanimously. These findings will now serve as a guide for the district’s new architects, Wight & Co., as they begin to develop a long-range facility plan, which is expected to address both safety issues and larger questions of school consolidation.

Events

No events

Leave a Comment





Latest News Stories

Illinois quick hits: Suspect in custody after state senator's home struck with gunfire

Illinois quick hits: Suspect in custody after state senator’s home struck with gunfire

By Jim Talamonti | The Center SquareThe Center Square Suspect in custody after state senator's home struck with gunfire A suspect is in custody after two homes were damaged by...

WATCH: Governor candidate: Low-cost districts shine while most IL schools spend, fail

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – According to a Republican candidate for Illinois governor, schools in the state can succeed without spending big....

WATCH: Pritzker threatens executive action regulating hemp if legislature won’t act

By Greg Bishop | The Center SquareThe Center Square (The Center Square) − After previous attempts were unsuccessful, Illinois Gov. J.B. Pritzker says he may take executive action to address...

WATCH: Illinois congresswoman OK withholding federal tax funds to change state policy

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – An Illinois congresswoman says she’s OK with plans of withholding federal tax dollars from Illinois if it...
Chicago mayor: 'We do not have a spending problem' as spending, deficit grows

Chicago mayor: ‘We do not have a spending problem’ as spending, deficit grows

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Mayor Brandon Johnson says Chicago does not have a spending problem, even as city government spending soars...
WATCH: Trump calls Pritzker ’nothing’ in public safety push; U.S. Rep. Mary Miller live

WATCH: Trump calls Pritzker ’nothing’ in public safety push; U.S. Rep. Mary Miller live

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – In today's edition of Illinois in Focus Daily, The Center Square Editor Greg Bishop airs the latest...
Illinois quick hits: Three dead outside Berwyn school; steady economic conditions reported

Illinois quick hits: Three dead outside Berwyn school; steady economic conditions reported

By Jim Talamonti | The Center SquareThe Center Square Three dead outside Berwyn school A Berwyn middle school is closed for instruction today after three people died in what authorities...
Joliet-Junior-college.-Graphic-Logo.2

Joliet Junior College, City of Joliet to Explore Joint Public Safety Institute

Joliet Junior College Board of Trustees Meeting | September 2025 Article SummaryThe Joliet Junior College (JJC) Board of Trustees approved an intergovernmental agreement with the City of Joliet to begin...
WATCH: Illinois prison mail scanning rule faces lawmaker scrutiny

WATCH: Illinois prison mail scanning rule faces lawmaker scrutiny

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – Emergency rules from the Illinois Department of Corrections to scan inmate mail are under review by...
solar panels photovoltaics in solar farm

Green Garden Township Confronts Massive 600-Megawatt Solar Project Proposal

Article Summary: A Virginia-based energy company is planning a 600-megawatt commercial solar facility that could cover over 5,000 acres of farmland across Green Garden, Wilton Center, and Manhattan Townships, sparking...
Screenshot 2025-09-23 at 8.30.59 PM

Green Garden Township Gets Green Light for New Town Hall Grant After Dramatic Reversal

Article Summary: After initially denying a request to transfer a $558,000 grant to a new building project, Will County has verbally reversed its decision, giving Green Garden Township the go-ahead...
Screenshot 2025-09-23 at 8.31.05 PM

Second Solar Farm with Battery Storage Proposed in Green Garden

Article Summary: A second, separate commercial solar project has been proposed in Green Garden Township by Turning Point Energy, adding to residents' growing concerns about farmland being converted for energy...
Meeting-Briefs-1

Meeting Summary and Briefs: Green Garden Township Board for September 8, 2025

The Green Garden Township Board meeting on September 8 was dominated by major developments concerning two separate large-scale solar farm proposals and a dramatic, last-minute reversal on grant funding for...
Joliet-Junior-college.-Graphic-Logo.3

JJC Moves Forward with Major Technology Overhaul to Modernize College Operations

Article Summary: The Joliet Junior College Board of Trustees received a detailed update on a sweeping Enterprise Resource Planning (ERP) project, a major initiative designed to modernize the college's core...
Joliet-Junior-college.-Graphic-Logo.2

Meeting Summary and Briefs: Joliet Junior College Board of Trustees for August 20, 2025

The Joliet Junior College Board of Trustees focused on a major technological overhaul, celebrated milestones in student support, and addressed internal governance issues at its regular meeting on August 20,...