Will County Board Graphic.01

County Approves $22 Million in Road Projects for Lorenzo Road and Mills Road

Spread the love

Will County Board Meeting | January 15, 2026

Article Summary: The Will County Board approved major infrastructure contracts, including an $18.8 million bridge replacement on Lorenzo Road and a $3.2 million design contract for the Mills Road corridor. These projects aim to improve freight mobility and safety in key transportation districts.

Public Works Committee Key Points:

  • Lorenzo Road Bridge: “D” Construction, Inc. was awarded an $18,872,967.20 contract to replace the bridge carrying Lorenzo Road over the BNSF Railway.

  • Mills Road Design: HDR, Inc. was awarded a $3,204,964 contract for Phase II design engineering on Mills Road from US Route 52 to Briggs Street.

  • Right-of-Way Acquisition: The board appropriated $175,980 for land acquisition related to improvements at Francis Road and Marley Road.

The Will County Board on Thursday, January 15, 2026, authorized substantial investments in county transportation infrastructure, approving construction and design contracts totaling over $22 million.

The largest expenditure approved was an $18,872,967.20 contract awarded to “D” Construction, Inc. of Coal City. The project involves the construction of a new two-span bridge carrying Lorenzo Road (County Highway 80) over the BNSF Railway in County Board District 1. The work includes realigning Cottage Road and constructing a temporary runaround to keep traffic moving during the project. Construction is estimated to begin in February 2026 with a completion date of November 2027.

In County Board District 6, the board authorized a professional services agreement with HDR, Inc. for $3,204,964. HDR will provide Phase II design engineering services for the improvement of Mills Road (County Highway 51) from US Route 52 to Briggs Street. The project aims to reconstruct and channelize the corridor to improve safety and drainage.

Additionally, the board approved a resolution appropriating $175,980 for right-of-way acquisition for intersection improvements at Francis Road (County Highway 64) and Marley Road. The resolution also authorized the State’s Attorney’s Office to proceed with condemnation proceedings if necessary to acquire the required parcels for the public safety project, which touches County Board Districts 2, 4, and 5.

Leave a Comment





Latest News Stories

WATCH: Trump calls Pritzker a ‘fat slob,’ Illinois governor blasts president

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – President Donald Trump has revived his criticism of Illinois Gov. J.B. Pritzker over crime, and Pritzker has...
D.C. Mayor Muriel Bowser won't seek reelection

D.C. Mayor Muriel Bowser won’t seek reelection

By Sarah Roderick-FitchThe Center Square Washington, D.C., Mayor Muriel Bowser announced she will not be seeking reelection. The Democratic mayor has served as the second female mayor of the nation’s...
Screenshot 2025-11-21 at 12.07.45 PM

Peotone School Board Approves Tentative Tax Levy, Advances $4.9M Bond Issuance

Peotone School Board Meeting | November 17, 2025 Article Summary:The Peotone School District 207-U Board of Education on Monday, November 17, 2025, approved a tentative $15.66 million tax levy and...
Illinois business group warns of 'backbreaking' progressive income tax

Illinois business group warns of ‘backbreaking’ progressive income tax

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Manufacturers say legislators at the Illinois State Capitol have done enough damage and a progressive tax would...
Trump's ACA tax credit extension proposal delayed after GOP pushback

Trump’s ACA tax credit extension proposal delayed after GOP pushback

By Thérèse BoudreauxThe Center Square After facing backlash from Republican leaders, the White House is backing away from its proposal to extend the enhanced Obamacare Premium Tax Credit for two...
EXCLUSIVE: Texas rep calls on Trump to get Texan released from Mexican prison

EXCLUSIVE: Texas rep calls on Trump to get Texan released from Mexican prison

By Bethany BlankleyThe Center Square Texas state Rep. Jay Dean, R-Longview, is calling on President Donald Trump, Gov. Greg Abbott, Secretary of State Marco Rubio, U.S. Senators Ted Cruz and...
Illinois tops U.S. in pumpkin production despite recent decline in value

Illinois tops U.S. in pumpkin production despite recent decline in value

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Despite a recent decline in production value, Illinois is far and away the leader when it comes...
Congress moves to restore federal union powers, critics warn of higher costs

Congress moves to restore federal union powers, critics warn of higher costs

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The U.S. Congress is set to vote on House Resolution 2550, a bill that would restore...
Blue Devil Logo Graphic

Warriors’ Defense Stifles Blue Devils in Lopsided Loss

PEOTONE — The Peotone Blue Devils endured a tough shooting night Friday, falling 52-20 to the Crete-Monee Warriors in non-conference girls basketball action. The Blue Devils (0-3) connected on just...
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

By Jim Talamonti | The Center SquareThe Center Square Chiropractor sentenced for fraud A Chicago chiropractor has been sentenced to nearly six years in federal prison for billing a private...
Screenshot 2025-11-21 at 10.19.55 AM

Lincoln-Way 210 Receives Clean Audit, Financial Profile Score Downgraded to ‘Review’

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: Lincoln-Way District 210 received a clean, unmodified opinion for its Fiscal Year 2025 audit, the highest rating possible....
Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial...
Will County Logo Graphic

Speed Limits Lowered in Green Garden and Frankfort Neighborhoods

Will County Board Meeting | November 2025 Article Summary: The Will County Board adopted ordinances to establish new, lower speed limits in specific areas of Green Garden and Frankfort Townships....
Will County Board Graphic.02

Engineering Firm Hired for Gougar Road Bridge Replacement

Will County Board Meeting | November 2025 Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian...
Will County Board Graphic.03

Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher

Will County Board Meeting | November 2025 Article Summary: The Will County Board approved a zoning map amendment and variances for a property in Beecher to bring existing unpermitted structures...