Will County Board Graphic.03

Will County Takes Jurisdiction of Countyline Road in $1.84 Million Agreement with Kankakee County

Spread the love

Will County Board Meeting | April 16, 2026

Article Summary: The Will County Board has approved a jurisdictional transfer that brings a 4.27-mile stretch of Countyline Road entirely under Will County’s control, paving the way for a major reconstruction project funded in part by a $1.84 million contribution from Kankakee County.

Countyline Road Transfer Key Points:

  • Will County will take over E12000N Road (Countyline Road) from IL Route 50 to near Will-Center Road.

  • Kankakee County will pay Will County $1.84 million in four annual installments of $460,000 using County Bridge Funds.

  • The funds are specifically earmarked for the reconstruction of two aging bridge structures (046-3232 and 046-3233).

  • The transferred road will be officially added to the Will County Highway System as Will CH 58.

The Will County Board on Thursday, April 16, 2026, unanimously approved an intergovernmental agreement to take over full jurisdiction of a 4.27-mile stretch of Countyline Road from neighboring Kankakee County to streamline a massive upcoming reconstruction project.

Under Resolution 26-111, Kankakee County will transfer its portion of E12000N Road (CH 16)—from the east edge of pavement on IL Route 50 easterly to approximately 1,260 feet west of N8000E Road (near Will-Center Road)—to Will County.

Rather than a simple administrative handoff, the transfer serves as the catalyst for a major infrastructure overhaul along the border of the two counties. By consolidating jurisdiction under the Will County Division of Transportation, Will County will now serve as the lead agency to commence Phase I preliminary engineering for the total reconstruction of the roadway between IL Route 50 and IL Route 1.

To facilitate the project, the Kankakee County Highway Department has agreed to a substantial financial contribution. Kankakee County will pay Will County a total of $1,840,000, disbursed in four annual installments of $460,000 from its County Bridge Funds.

According to the resolution, the $1.84 million from Kankakee County will be utilized specifically for the reconstruction of two shared bridge structures along the route, identified as Structures 046-3232 and 046-3233.

Following approval from the Illinois Department of Transportation, the 4.27-mile corridor will be officially deleted from the Kankakee County Highway System and added to the Will County Highway System under the new designation of Will CH 58, located in County Board District 1. The project will subsequently be added to Will County’s Transportation Improvement Program to ensure the roadway’s reconstruction is fully funded and completed.

Leave a Comment





Latest News Stories

D.C. Mayor Muriel Bowser won't seek reelection

D.C. Mayor Muriel Bowser won’t seek reelection

By Sarah Roderick-FitchThe Center Square Washington, D.C., Mayor Muriel Bowser announced she will not be seeking reelection. The Democratic mayor has served as the second female mayor of the nation’s...
Screenshot 2025-11-21 at 12.07.45 PM

Peotone School Board Approves Tentative Tax Levy, Advances $4.9M Bond Issuance

Peotone School Board Meeting | November 17, 2025 Article Summary:The Peotone School District 207-U Board of Education on Monday, November 17, 2025, approved a tentative $15.66 million tax levy and...
Illinois business group warns of 'backbreaking' progressive income tax

Illinois business group warns of ‘backbreaking’ progressive income tax

By Greg Bishop | The Center SquareThe Center Square (The Center Square) – Manufacturers say legislators at the Illinois State Capitol have done enough damage and a progressive tax would...
Trump's ACA tax credit extension proposal delayed after GOP pushback

Trump’s ACA tax credit extension proposal delayed after GOP pushback

By Thérèse BoudreauxThe Center Square After facing backlash from Republican leaders, the White House is backing away from its proposal to extend the enhanced Obamacare Premium Tax Credit for two...
EXCLUSIVE: Texas rep calls on Trump to get Texan released from Mexican prison

EXCLUSIVE: Texas rep calls on Trump to get Texan released from Mexican prison

By Bethany BlankleyThe Center Square Texas state Rep. Jay Dean, R-Longview, is calling on President Donald Trump, Gov. Greg Abbott, Secretary of State Marco Rubio, U.S. Senators Ted Cruz and...
Illinois tops U.S. in pumpkin production despite recent decline in value

Illinois tops U.S. in pumpkin production despite recent decline in value

By Jim Talamonti | The Center SquareThe Center Square (The Center Square) – Despite a recent decline in production value, Illinois is far and away the leader when it comes...
Congress moves to restore federal union powers, critics warn of higher costs

Congress moves to restore federal union powers, critics warn of higher costs

By Catrina Barker | The Center Square contributorThe Center Square (The Center Square) – The U.S. Congress is set to vote on House Resolution 2550, a bill that would restore...
Blue Devil Logo Graphic

Warriors’ Defense Stifles Blue Devils in Lopsided Loss

PEOTONE — The Peotone Blue Devils endured a tough shooting night Friday, falling 52-20 to the Crete-Monee Warriors in non-conference girls basketball action. The Blue Devils (0-3) connected on just...
Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

Illinois quick hits: Chiropractor sentenced for fraud; fatal airport shooting investigation

By Jim Talamonti | The Center SquareThe Center Square Chiropractor sentenced for fraud A Chicago chiropractor has been sentenced to nearly six years in federal prison for billing a private...
Screenshot 2025-11-21 at 10.19.55 AM

Lincoln-Way 210 Receives Clean Audit, Financial Profile Score Downgraded to ‘Review’

Lincoln-Way Community High School District 210 Meeting | November 20, 2025 Article Summary: Lincoln-Way District 210 received a clean, unmodified opinion for its Fiscal Year 2025 audit, the highest rating possible....
Will County P&Z Logo Planning Zoning.2

Committee Grants Lenox Solar Farm Project Six-Month Variance Extension

Will County Planning and Zoning Commission Meeting | November 18, 2025 Article Summary:The Will County Planning and Zoning Commission has approved a 180-day extension for variances tied to a commercial...
Will County Logo Graphic

Speed Limits Lowered in Green Garden and Frankfort Neighborhoods

Will County Board Meeting | November 2025 Article Summary: The Will County Board adopted ordinances to establish new, lower speed limits in specific areas of Green Garden and Frankfort Townships....
Will County Board Graphic.02

Engineering Firm Hired for Gougar Road Bridge Replacement

Will County Board Meeting | November 2025 Article Summary: The Will County Board authorized a $301,000 contract for the design of a new bridge carrying Gougar Road over the Canadian...
Will County Board Graphic.03

Unpermitted Log Cabin and Stage Prompt Rezoning in Beecher

Will County Board Meeting | November 2025 Article Summary: The Will County Board approved a zoning map amendment and variances for a property in Beecher to bring existing unpermitted structures...
Federal court blocks Trump from dismantling four agencies

Federal court blocks Trump from dismantling four agencies

By Dave Mason | The Center SquareThe Center Square (The Center Square) – A federal court has issued a permanent injunction stopping the Trump administration from dismantling four federal agencies...