Will County P&Z Logo Planning Zoning.2

Zinc Leaching and Flooding Concerns Dominate Testimony at Will County Solar Hearing

Spread the love

Will County Board Special Planning and Zoning Commission Meeting | May 12, 2026

Article Summary: Expert and resident testimonies during Tuesday’s Planning and Zoning Commission meeting highlighted severe concerns over groundwater contamination and flooding if a 6,000-acre solar farm is built on hydric soils.

Environmental Impact Key Points:

  • A Will-South Cook Soil and Water Conservation District report (NRI #5824) classified the site as “essential farmland” with a LESA score of 236.

  • Approximately 2,152 acres of the proposed site contain hydric soils that present a high risk for steel corrosion.

  • A foundation drilling expert testified that driving raw galvanized steel posts into hydric soil could cause rapid corrosion, risking zinc leaching into local aquifers.

  • Residents from Green Garden Township presented video evidence of existing severe flooding on parcels adjacent to the proposed solar arrays.

A debate over soil chemistry, galvanized steel, and floodplains took center stage at the Will County Planning and Zoning Commission on Tuesday, May 12, 2026, as residents and experts warned of potential environmental disasters from the proposed Earthrise solar project.

During the court-ordered cross-examination hearing, plaintiffs focused heavily on Natural Resource Information Report #5824, prepared by the Will-South Cook Soil and Water Conservation District. The report calculated a Land Evaluation and Site Assessment (LESA) score of 236 for the property—classifying it as essential farmland—and noted that approximately 2,152 acres of the site consist of hydric soils.

Crucially, the report indicated that the site presents a “high” risk for steel corrosion. Plaintiff Attorney Steven Becker questioned Earthrise developers on their plan to drive an estimated 300,000 bare galvanized steel posts into the ground to support the 1.19 million solar modules.

To support the plaintiffs’ claims, Melissa Eager, an operating engineer with 30 years of experience in the caisson drilling industry, testified about the dangers of placing untreated steel into wet soils.

“Anything put into ground that is wet is going to eventually leach out,” Eager testified. “A pinhole into that galvanization will corrode… when put in a hydric soil or wet locations it’s usually anywhere from 3 to 5 years.”

Eager suggested that the posts should be coated in epoxy or encased in concrete. However, she warned that using heavy machinery to encase thousands of posts in concrete would heavily compact the area’s silty loam soil, creating a “hard pan” that would drastically increase surface erosion and water runoff.

Earthrise Lead Developer Robert Kalbouss and attorney Ben Jacobi refuted the claims, relying on prior testimony from their environmental scientist, Dr. Chris Olsen. Jacobi stated that any leaching from the galvanized steel would be minimal and isolated directly next to the pile, posing no threat to crops or groundwater.

“There is no evidence of or documented evidence of steel piles from solar facilities leaching into the groundwater. It doesn’t exist,” Jacobi said. “We don’t believe that our construction methods pose a risk to public health or agriculture.”

The potential for exacerbated runoff struck a nerve with neighboring property owners. Green Garden Township residents Jim Michalewicz and Donna Robinson presented photographs and video footage showing substantial standing water and flooding on their properties, which abut the proposed solar parcels.

Robinson showed video of her yard flooding on three sides, noting that neighboring landowners had failed to maintain culverts, causing water to back up onto her property. She expressed deep concern that industrial development on the adjacent fields would push even more water into her yard.

Becker underscored these concerns, pointing out that the Earthrise project footprint sits near the headwaters of Fork Creek, Prairie Creek, and Hickory Creek. He warned the commission that any groundwater contamination could easily travel into these tributaries, potentially violating the federal Clean Water Act.

Leave a Comment





Latest News Stories

WCO-Public-Safety.4

Will County Animal Protection Services Seeks New Facility Amid “Gaping Wound” of Space Crisis

Article Summary: Will County Animal Protection Services is seeking approval for a new facility, telling a county committee that its current building is critically inadequate for housing animals, leading to...
WCO-Cap-Imp-8.5.2

Board Confronts Animal Services Crowding, Explores Future Facility Options

ARTICLE SUMMARY: Will County officials are grappling with an ongoing animal housing crisis that has overwhelmed the county’s Animal Protective Services facility, prompting discussions about expansion, new construction, or even repurposing...
WCO-Finance-Aug-5.3

Will County Board Members Demand Transparency in Cannabis Tax Fund Allocation

ARTICLE SUMMARY: A debate over transparency and process erupted at the Will County Board’s Finance Committee meeting regarding the distribution of local cannabis tax revenue. Board members called for more...
WCO-PZ-Aug-5.2

Homer Glenn Residents Push Back on 143rd Street Widening as Officials Signal “Tentative Agreement”

ARTICLE SUMMARY: A Homer Glenn farm owner voiced strong opposition to the planned widening of 143rd Street during a county meeting, while committee members indicated a "tentative agreement" is in the...
WCO-LEG-8.5.1

Will County Forges 2026 Federal Agenda Amid D.C. Policy Shifts, ‘Big Beautiful Bill’ Impacts

ARTICLE SUMMARY: The Will County Board's Legislative Committee is reshaping its federal priorities for 2026, adding new language on environmental justice and LGBTQIA+ rights while creating a more transparent process for...
WCO-Public-Safety.3

Health Department Seeks $1 Million Levy Increase to Prevent “Weakened System”

Article Summary: The Will County Health Department is asking for a $1 million increase to its property tax levy to save 11 critical jobs that are at risk as post-pandemic...
WCO-Cap-Imp-8.5.3

County Rolls Out New “OneMeeting” Software to Improve Public Access

ARTICLE SUMMARY: Will County has officially launched a new agenda and meeting management software called "OneMeeting," aimed at improving transparency and making it easier for the public and officials to access...
Meeting-Briefs

Meeting Summary and Briefs: Will County Board Finance Committee for August 5, 2025

The Will County Board’s Finance Committee confronted major budget challenges during its Tuesday meeting, led by a stark presentation from the Will County Health Department. Health officials are requesting an...
WCO-PZ-8.12.2

Will County PZC Approves Rezoning for Truck Repair Facility on Manhattan Road Amid Resident Concerns

Article Summary: The Will County Planning and Zoning Commission voted 4-2 to rezone nearly 14 acres in Joliet Township for a truck repair facility. The approval came after a neighboring...
WCO-PZ-Aug-5.3

Key Stretch of Bell Road on Track for Thanksgiving Reopening, Committee Approves Additional Funds

ARTICLE SUMMARY Construction on Bell Road between 159th and 151st Streets is scheduled to have all lanes open by Thanksgiving, officials announced as the Public Works & Transportation Committee approved a...
WCO-LEG-8.5.2

Will County Leglislative Committee Opposes Federal Push for Heavier, Longer Trucks

ARTICLE SUMMARY: The Will County Board's Legislative Committee unanimously passed a resolution opposing any federal legislation that would increase the size and weight limits for commercial trucks on national roadways. Will...
WCO-Public-Safety.2

Will County Reports Progress in Opioid Fight, Highlights New FDA Labeling Rules

Article Summary: Will County is seeing a reduction in opioid overdose deaths and is expanding access to the reversal drug Narcan, health officials reported. The department also drew attention to...
WCO-Cap-Imp-8.5.4

In-House Staff Completes Major Renovations at Will County Adult Detention Facility

ARTICLE SUMMARY: Maintenance staff at the Will County Adult Detention Facility recently completed extensive renovations in-house, including a new control center and the full restoration of a 48-cell housing unit, saving...
Land-use-8.5.25

Will County Advances Truck Repair Facility Plan on Manhattan Road Despite Resident Objections

Article Summary: A proposal to rezone nearly 14 acres on Manhattan Road for a truck repair facility advanced after receiving a recommendation for approval from the Will County Land Use...
WCO-PZ-8.12.1

PZC Grants Variance for Oversized Garage in Joliet Township, Reversing Staff Recommendation

Article Summary: The Will County Planning and Zoning Commission unanimously approved a variance for a Joliet Township homeowner to build a garage addition that exceeds the county's size limits. The...